Projects

First Quote

Included:

Repairing of 2 x drains

Grid

Earthworks / Paving prep

Total Cost: 6622.30

Dismissing 1st Quote Results:

2nd Quote to repair only 1 drain was accepted instead

Total cost:  R 8027

Dismissing 1st Quote Results:

Flooding due to 2nd drain being blocked and not capable of removing water.

This resulted in more payments, losses and countless arguments. What was the reason or logic behind all of this?

Lessons learned:

Don't overlook a great quote.

Read the fine print.  Trust your gut feeling.

IMG_20210226_122025
IMG_20210226_122025

IMG_20210311_084049
IMG_20210311_084049

IMG_20210406_181002_edited
IMG_20210406_181002_edited

IMG_20210226_122025
IMG_20210226_122025

1/17